Tribe Engineering provided assurance reports to the US based infrastructure maintenance machine manufacturer Loram – Maintenance of Way for the design of a new build rail grinding machine against EN14033 to support the sale of the machine to a non-European customer.

As the design was not yet complete, much of this work had to be done against the concept design and verified when detail design was finalised. The Assurance report informed the design to ensure it was accepted on delivery.

This work was undertaken remotely using collaborative working technology.